ORP Heweliusz

From SpottingWorld, the Hub for the SpottingWorld network...
300px
Career (Poland) 100x35px
Name: ORP Heweliusz
Laid down: 11 March 1981
Launched: 11 September 1981
Commissioned: 27 November 1982
General characteristics
Length: 61.6 m (202 ft 1 in)
Beam: 10.8 m (35 ft 5 in)
Draft: 3.3 m (10 ft 10 in)
Speed: 13.7 knots (25.4 km/h; 15.8 mph)
Complement: 49
Armament: none

ORP Heweliusz is a survey ship of the Polish Navy of the Projekt 874 class, known as modified Finik class in NATO code. She was launched on 11 September 1981 and commissioned on 27 November 1982.

The sister ship of ORP Arctowski is named after the astronomer Johannes Hevelius (Polish: Jan Heweliusz).

See also



pl:ORP Heweliusz