USS New Hampshire (SSN-778)

From SpottingWorld, the Hub for the SpottingWorld network...
Pre-commissioning Unit New Hampshire (SSN-778) sits moored to the pier at General Dynamics Electric Boat shipyard moments before her christening ceremony commenced.
Career (US)
Name: USS New Hampshire
Namesake: The State of New Hampshire
Ordered: 14 August 2003
Builder: General Dynamics Electric Boat
Laid down: 30 April 2007
Launched: 21 February 2008 [1]
Christened: 21 June 2008 [2]
Commissioned: 25 October 2008 [3]
Motto: "Live Free or Die"
Badge:
General characteristics
Class and type: Virginia-class submarine
Displacement: 7,800 tons
Length: 377 feet (115 m)
Beam: 34 feet (10 m)
Propulsion: S9G reactor
Speed: 25 knots (46 km/h)
Range: Essentially unlimited distance; 33 years
Test depth: 800 ft (244 m)
Complement: 134 officers and enlisted
Armament:

12 × VLS (BGM-109 Tomahawk cruise missile) &

4 × 533mm torpedo tubes (Mk-48 torpedo)

USS New Hampshire (SSN-778), a Virginia-class nuclear-powered attack submarine, is the fourth ship of the United States Navy to be named for the state of New Hampshire (though one of her predecessors, BB-70, existed only on paper — authorized, but cancelled before keel laying). The name was awarded to the submarine after a letter-writing campaign by the third-graders from Garrison Elementary School in Dover to their members of Congress, the state governor, and the Secretary of the Navy.[4]

The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 14 August 2003. Construction began in January 2004.[5] A keel-laying ceremony for the submarine was held at Electric Boat's Quonset Point facility in North Kingstown, Rhode Island, on 30 April 2007. The ship's sponsor was Cheryl McGuinness of Portsmouth, New Hampshire, the widow of Thomas McGuinness, co-pilot of American Airlines Flight 11, who died in the September 11, 2001 attacks when the jet was flown into the North Tower of the World Trade Center.[6]

The submarine was launched on 21 February 2008 and christened four months later, on 21 June 2008 in Groton, Connecticut, eight months ahead of schedule and $54 million under budget.[2][7] USS New Hampshire finished sea trials and was delivered to the Navy 28 August 2008.[8] The ship was commissioned in a ceremony at the Portsmouth Naval Shipyard in Kittery, Maine, on 25 October 2008.[9]


References

This article includes information collected from the Naval Vessel Register, which, as a U.S. government publication, is in the public domain. The entry can be found here.

External links

de:USS New Hampshire (SSN-778) fr:USS New Hampshire (SSN-778) ja:ニューハンプシャー (原子力潜水艦) no:USS «New Hampshire» (SSN-778) pl:USS New Hampshire (SSN-778) ru:USS New Hampshire (SSN-778)