USS Plymouth (1844)
Career (US) | 100x35px |
---|---|
Laid down: | date unknown |
Launched: | at the Boston Navy Yard |
In service: | circa 3 April 1844 |
Out of service: | 20 April 1861 |
Struck: | 1861 (est.) |
Fate: | scuttled, 20 April 1861 |
General characteristics | |
Displacement: | 189 tons |
Length: | 147’ (lbp) |
Beam: | 38’ 1” |
Draught: | depth of hold 17’ 2” |
Propulsion: | sail |
Speed: | not known |
Complement: | not known |
Armament: |
four 8” shell guns eighteen 32-pounder guns |
USS Plymouth (1844) was a sloop-of-war constructed and commissioned just prior to the Mexican-American War. She was heavily gunned, and traveled to Japan as part of Commodore Matthew C. Perry’s effort to force Japan to open her ports to international trade. She also served in European and Caribbean waters and, later in her career, she was used to train midshipmen.
Plymouth was the first ship of the United States Navy to be named for Plymouth, Massachusetts, a town on Plymouth Bay, about 35 miles southeast of Boston, Massachusetts. Plymouth was founded by the Pilgrims in 1620.
Contents
Built in Boston in 1844
Built by the Boston Navy Yard, she departed Boston, Massachusetts, on 3 April 1844 for the Mediterranean Sea, Commander Henry Henry in command.
After over a year in European waters, she sailed westward and arrived at New York City on 4 October 1846.
Far East operations
Following service on the east coast, Plymouth departed New York City, 13 February 1848, for the Far East, returning to Norfolk, Virginia, from the East Indies on 29 January 1851. On 23 August 1851 she stood out from Hampton Roads, Virginia, bound once again for the Orient.
After duty on the East Indies Station, she joined Commodore Matthew C. Perry's expedition to Japan, entering Tokyo Bay on 8 July 1853 and departing on 17 July. She returned in February of the following year and before heading home put into Shanghai where she sent a party ashore to support a coordinated British-American expedition against hostile forts in the area.
Returning to Norfolk, Virginia, 11 January 1855, Plymouth began an extended tour in the Atlantic Ocean. Assigned as midshipmen training ship during the summers of 1855 and 1856, she tested new ordnance under the command of Commander John A. Dahlgren in 1858 and resumed duties as a training ship for midshipmen during the summers of 1859 and 1860.
Scuttled during the American Civil War
Plymouth was at Norfolk, Virginia, for repairs during the secession crises in the winter of 1860–1861. After Virginia seceded from the Union, she was burned and scuttled there, 20 April 1861, to prevent her capture by the forces of the Confederate States of America when the Norfolk Navy Yard fell into their hands.
References
This article includes text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.
See also
- Ship infoboxes without an image
- Pages with broken file links
- Wikipedia articles incorporating text from the Dictionary of American Naval Fighting Ships
- Mexican–American War ships of the United States
- Ships of the Union Navy
- Ships built in Massachusetts
- United States Navy sloops
- Gunboats of the United States Navy
- United States Naval Academy
- School ships of the United States Navy
- 1844 ships